Guerrera Construction

About Project

Orange DOT

CONTRACT TYPE

LOCATION

TYPE OF WORK

Prime Contractor
ORANGE, CT
interchange reconstruction and roadway improvement

PROJECT DETAILS

Interchange 57/58 Improvements on Route 15 Southbound in the town (s) of Orange

The Connecticut Department of Transportation’s (Department) Office of Engineering is developing plans to make interchange improvements on Route 15 southbound at Exit 57 in the town of Orange. The purpose of the project is to reduce the occurrence of rear-end crashes and congestion at the on-ramp from Route 34 eastbound onto Route 15 southbound, by removing the stop-controlled interchange to provide an acceleration lane for traffic to merge onto Route 15.  The project involves widening Route 15 for the acceleration lane which will require tree removal and modifying pavement markings.  Additionally, all four inner loop ramps will be milled and overlaid with high friction pavement.

IMG_2080 (1)

PHOTO GALLERY

Ready to build with us?

Join Guerrera Construction and be part of a team committed to excellence. Help us build impactful projects that shape the future of construction.