Seymour Bank Street

CONTRACT TYPE

LOCATION

TYPE OF WORK

Prime Contractor
Seymour, CT
ROAD CONSTRC

PROJECT DETAILS

CTDOT 0124-0172 Spot Improvements on Bank Street (Route 67) and River Street (Route 313)

Construct roadway widening/narrowing, storm drainage modifications, guiderail, installation of curbing and sidewalks, and driveway modifications.  Construction of one cast in place concrete retaining wall with full bed depth stone veneer and one soil nail retaining wall with simulated masonry facing wall.

Coordinate utility pole relocations and Install new Mast Arms with drilled foundations at two intersections for new traffic control signals with associated underground foundations and conduit.

Blasting and painting of bridge girders.

Following the granite stone curb installations, storm drain modifications, trenching for traffic control signals, retaining wall construction, bridge work, the roadway will be resurfaced as the final project stage, including: Mill and overlay, Final pavement markings,  Loop detector replacement, and Installation of new signage.